


The dredged material is temporarily dewatered in an adjacent lagoon. The nutrient-rich sediments are then responsibly applied to the fields of local farmers, giving the material a valuable second use.
This project is carried out in close collaboration with Witham Fourth IDB, Miles Water Engineering, and JESpence & Son. Thanks to this cooperation, the work is executed safely, efficiently, and sustainably, with respect for both the ecosystem and the local community.





